Train 5S49 Brighton to Three Bridges Tl Up Depot

Operated By Thameslink

d. 1942

p. 1945

p. 1951

Keymer Jn

2min Pathing Allowance

p. 1951

p. 1956

p. 1957

p. 2001

Three Bridges Signal T288

Stops For Operating Reasons

a. 2003

d. 2004

a. 2015

Schedule Info

Departing Thu 19/05/2022
Created Sat 26/02/22 02:08
Validity 16/05/22 until 09/12/2022
Schedule ID W80863 (1438641)
Schedule Type WTT
Duration 00 hrs 33 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 22788002
Flow Info Thameslink Empty Coach Stock Movements
Member Info Log In