Train 9R62 Three Bridges to Luton

Operated By Thameslink

d. 1956

a. 2001

d. 2002

a. 2004

d. 2005

a. 2008

d. 2009

a. 2012

d. 2012

a. 2016

d. 2018

p. 2024

a. 2026

d. 2027

a. 2030

d. 2030

a. 2032

d. 2033

p. 2034

p. 2035

a. 2037

d. 2038

p. 2041

Blue Anchor (Kent)

1min Performance Allowance

5

p. 2046

a. 2049

d. 2051

Metropolitan Jn

1min Performance Allowance

p. 2052

p. 2055

a. 2056

d. 2057

a. 2058

d. 2059

a. 2100

d. 2101

St Pancras International

Electric Power From Here
Speed Increase to 100mph
Timed for 700 tonnes from here
1min Performance Allowance

a. 2105

d. 2106

p. 2108

p. 2110

p. 2111

p. 2115

p. 2119

a. 2123

d. 2125

p. 2129

a. 2130

d. 2131

Luton Airport Parkway

1min Eng. Allowance

a. 2136

d. 2137

a. 2141

Schedule Info

Departing Wed 05/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID W26087 (10479880)
Schedule Type WTT
Duration 01 hrs 45 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Express Passenger (XX)
Characteristics Driver Only Operated (DOO)
Service Code 22729000
Flow Info Thameslink

Passenger Info

Member Info Log In