Train 2U04 London Victoria to Gravesend

Operated By Southeastern

Arrived Gravesend 1916

d. 1803

NR

p. 1805

NR

p. 1807

NR

p. 1809

NR

p. 1811

NR

a. 1812

d. 1813

NR

NR


p. 1814

NR

a. 1815

d. 1816

NR

NR


Nunhead

Call Point Amended To New Cross

a. 1818

d. 1819

NR

NR


Plat 4

a. 1825

d. 1826

1832

1833

7L

7L

Plat 2

a. 1828

d. 1829

1835

1836

7L

7L

a. 1832

d. 1832

1839

1839

7L

7L

a. 1835

d. 1836

1843

1843

8L

7L

a. 1838

d. 1839

1845

1846

7L

7L

a. 1841

d. 1841

1848

1848

7L

7L

a. 1844

d. 1845

1851

1851

7L

6L

a. 1847

d. 1848

1854

1854

7L

6L

p. 1851

NR

p. 1853

NR

p. 1853

NR

Dartford

1min Pathing Allowance

Plat 4

a. 1855

d. 1856

1900

1901

5L

5L

Greenhithe For Bluewater

1min Pathing Allowance

a. 1901

d. 1903

1906

1907

5L

4L

p. 1907

1912

5L

Gravesend

Then Forming P18391

a. 1911

1916

5L

Schedule Info

Departing Thu 10/07/2025
Created Wed 30/04/25 20:30
Validity 19/05/25 until 10/10/2025
Schedule ID P18444 (12418799)
Schedule Type WTT
Duration 01 hrs 08 mins
TRUST ID 872U04MW10
Activated 16:03:04 10/07/25
Call Type Automatic
Sector 80

Train Info

Operated By Southeastern
Timed For 75mph
Power Type EMU
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 24650000
Flow Info London - Gillingham Via Bexleyheath-Peak Trains

Passenger Info

Member Info Log In
Sightings