Train 9U97 Heathrow Terminal 4 to Abbey Wood (Crossrail)

Operated By Crossrail

Cancelled at London Padding at 09:16
(XP - Bridge Strike)
Paddington Crossrail changed to London Paddington

d. 0930

0942

12L

a. 0934

d. 0936

0947

0949

13L

13L

p. 0939

0953

14L

p. 0939

0953

14L

p. 0940

0954

14L

Hayes & Harlington

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

Plat 4

a. 0941

d. 0942

0955

0955

14L

13L

Plat 4 RL

a. 0944

d. 0945

0958

0959

14L

14L

Plat 3

a. 0947

d. 0948

1002

1002

15L

14L

Plat 4 RL

a. 0949

d. 0950

1004

1004

15L

14L

Plat 4 RL

a. 0951

d. 0952

1006

1008

15L

16L

p. 0953

1009

16L

Acton Main Line

1min Eng. Allowance

Plat 3 (booked URL)

a. 0954

d. 0955

1011

1011

17L

16L

p. 0959

NR

p. 1000

1017

17L

p. 1000

1017

17L

Paddington Crossrail

Call Point Amended To London Paddington

a. 1002

d. 1004

1020

NR

18L

a. 1006

d. 1007

a. 1008

d. 1009

a. 1011

d. 1012

a. 1017

d. 1017

a. 1020

d. 1021

a. 1024

d. 1025

a. 1029

d. 1030

Schedule Info

Departing Wed 09/07/2025
Created Fri 17/01/25 23:02
Validity 19/05/25 until 12/12/2025
Schedule ID P07422 (11655077)
Schedule Type WTT
Duration 01 hrs 04 mins
TRUST ID 739U97MF09
Activated 07:30:10 09/07/25
Call Type Automatic
Sector 33

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381202
Flow Info Normal Services

Passenger Info

Member Info Log In
Sightings