Train 9U91 Heathrow Terminal 4 to Abbey Wood (Crossrail)

Operated By Crossrail

Cancelled at London Padding at 10:17
(I7 - Engineer's train late into, from or failed in possession)
Paddington Crossrail changed to London Paddington

d. 1945

1945

RT

Plat 1 (booked 2)

a. 1949

d. 1951

1950

1950

1L

1E

p. 1954

1954

RT

p. 1954

1954

RT

p. 1955

1955

RT

Hayes & Harlington

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

Plat 4

a. 1956

d. 1957

1956

1957

RT

RT

Plat 4 RL

a. 1959

d. 2000

1959

2000

RT

RT

Plat 3

a. 2002

d. 2003

2003

2003

1L

RT

Plat 4 RL

a. 2004

d. 2005

2005

2006

1L

1L

Plat 4 RL

a. 2006

d. 2007

2018

2020

12L

13L

p. 2008

2020

12L

Acton Main Line

1min Eng. Allowance

Plat 3 (booked URL)

a. 2009

d. 2010

2022

2023

13L

13L

p. 2014

NR

p. 2015

2028

13L

p. 2015

2028

13L

Paddington Crossrail

Call Point Amended To London Paddington

a. 2017

d. 2019

2031

NR

14L

a. 2021

d. 2022

a. 2023

d. 2024

a. 2026

d. 2027

a. 2032

d. 2032

a. 2035

d. 2036

a. 2039

d. 2040

a. 2044

d. 2045

Schedule Info

Departing Sat 03/05/2025
Created Wed 25/09/24 20:17
Validity 21/12/24 until 17/05/2025
Schedule ID P02829 (10509842)
Schedule Type WTT
Duration 01 hrs 04 mins
TRUST ID 739U91MY03
Activated 17:45:20 03/05/25
Call Type Automatic
Sector 33

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381202
Flow Info Normal Services

Passenger Info

Member Info Log In
Sightings