Train 6C02 Crewe Bas Hall S.S.N. to Carlisle N.Y.

Operated By DRS, Runs Only If Required

d. 0422

p. 0427

p. 0429

p. 0434

p. 0444

p. 0449

Acton Bridge

1min Eng. Allowance

p. 0451

Weaver Jn

1min Pathing Allowance

p. 0454

p. 0500

p. 0502

p. 0503

Winwick Jn

1min Pathing Allowance

p. 0506

Golborne Jn

1min Pathing Allowance

SL

p. 0511

p. 0520

p. 0521

p. 0522

Balshaw Lane

1min Eng. Allowance

SL

p. 0532

p. 0535

p. 0539

DFL

p. 0541

p. 0543

p. 0544

p. 0549

Garstang & Catteral

1min Pathing Allowance

p. 0554

p. 0607

p. 0609

Carnforth North Jn

3min Pathing Allowance

p. 0614

p. 0632

Grayrigg

1min Eng. Allowance

p. 0644

p. 0652

p. 0703

p. 0707

Penrith North Lakes

2min Eng. Allowance

p. 0717

p. 0738

p. 0740

a. 0755

Schedule Info

Departing Sat 06/08/2022
Created Fri 28/01/22 02:08
Validity 21/05/22 until 10/12/2022
Schedule ID H28771 (1089820)
Schedule Type WTT
Duration 03 hrs 33 mins

Train Info

Operated By DRS
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 1235
Characteristics Runs to Terminals/Yards as required
Service Code 95998090
Flow Info Infrastructure Services - MRA
Member Info Log In