Train 9N60 Abbey Wood (Crossrail) to Maidenhead

Operated By Crossrail

a. 2249

d. 2249

a. 2253

d. 2253

a. 2256

d. 2257

a. 2300

d. 2301

a. 2306

d. 2307

a. 2309

d. 2310

a. 2311

d. 2312

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 2314

d. 2318

p. 2321

p. 2324

a. 2325

d. 2326

West Ealing

1min Pathing Allowance

Plat 3 RL

p. 2327

a. 2331

d. 2332

a. 2334

d. 2335

p. 2336

a. 2338

d. 2339

a. 2341

d. 2341

a. 2343

d. 2349

a. 2352

d. 2353

a. 2356

d. 2356

Taplow

1min Eng. Allowance

a. 2358

d. 2359

p. 0002

a. 0003

Schedule Info

Departing Sat 30/11/2024
Created Tue 20/02/24 20:43
Validity 08/06/24 until 14/12/2024
Schedule ID C84812 (8838718)
Schedule Type WTT
Duration 01 hrs 17 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381901
Flow Info Normal Services

Passenger Info

Member Info Log In