Train 5T53 Brighton to Brighton Down Siding

Operated By Thameslink

Arrived Brighton Reception Road 2012

d. 1958

2009

11L

a. 2001

d. 2004

2012

NR

11L

Schedule Info

Departing Tue 25/03/2025
Created Tue 25/03/25 15:13
Validity 25/03/25 Only
Schedule ID 67619 (12214626)
Schedule Type VSTP
Duration 00 hrs 17 mins
TRUST ID 875T532Y25
Activated 18:58:39 25/03/25
Call Type Automatic
Sector 88

Train Info

Operated By Thameslink
Power Type EMU
Service Type Empty Coaching Stock (ECS) (EE)
Service Code 22788002
Flow Info Thameslink Empty Coach Stock Movements
Member Info Log In
Sightings