Train 5C04 Barrow C.S. to Carlisle

Operated By Northern

Arrived Workington 1128

d. 0910

0938

28L

a. 0913

d. 0917

0941

0949

28L

32L

p. 0923

0956

33L

p. 0926

0958

32L

p. 0933

1005

32L

p. 0938

1011

33L

p. 0942

1014

32L

p. 0947

1020

33L

p. 0955

1027

32L

Sellafield

2min Pathing Allowance

p. 1000

1032

32L

a. 1012

d. 1022

1052

1054

40L

32L

Whitehaven

1min Pathing Allowance

a. 1028

d. 1028

1102

1102

34L

34L

p. 1033

1107

34L

Parton North Jn

2min Pathing Allowance

p. 1037

1119

42L

Workington

2min Pathing Allowance

a. 1046

d. 1048

1128

NR

42L

p. 1057

p. 1116

p. 1128

a. 1132

Schedule Info

Departing Tue 21/01/2025
Created Tue 21/01/25 09:13
Validity 21/01/25 Only
Schedule ID 50929 (11672482)
Schedule Type VSTP
Duration 02 hrs 22 mins
TRUST ID 115C042E21
Activated 09:13:05 21/01/25
Call Type Manual
Sector 23

Train Info

Operated By Northern
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Empty Coaching Stock (ECS) (EE)
Service Code 21799100
Flow Info Unplanned North East
Member Info Log In
Sightings