Train 2B88 Glasgow Central to Lanark

Operated By ScotRail

Glasgow Central

Formed from 2B81

Plat 4 A1

d. 0922

p. 0924

p. 0925

p. 0926

a. 0929

d. 0930

p. 0931

p. 0932

a. 0934

d. 0934

p. 0935

Bellshill

2min Pathing Allowance

a. 0938

d. 0938

p. 0942

a. 0946

d. 0948

Shieldmuir

2min Pathing Allowance

a. 0951

d. 0951

Wishaw

2min Pathing Allowance

a. 0957

d. 0958

p. 1003

Carluke

2min Pathing Allowance

a. 1005

d. 1006

p. 1013

Lanark

Then Forming 2B93

a. 1018

Schedule Info

Departing Tue 01/07/2025
Created Tue 21/01/25 21:42
Validity 19/05/25 until 12/12/2025
Schedule ID Y67511 (11687235)
Schedule Type WTT
Duration 00 hrs 56 mins

Train Info

Operated By ScotRail
Timed For 100mph
Power Type EMU
Timing Load Class 385
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 23563015
Flow Info Argyle Line

Passenger Info

Member Info Log In