Train 1V92 Gatwick Airport to Reading

Operated By GWR

d. 2322

p. 2325

Earlswood (Surrey)

1min Pathing Allowance

p. 2327

Redhill

Driver Changes Ends
Diesel Power From Here
Speed Increase to 90mph
Timed for T tonnes from here

a. 2331

d. 2334

a. 2338

d. 2339

p. 2343

a. 2346

d. 2347

p. 2348

p. 2353

p. 2357

p. 2359

p. 0001

a. 0002

d. 0004

Ash

p. 0012

a. 0015

d. 0016

a. 0021

d. 0022

Blackwater Signal Bef2979

2min Pathing Allowance

p. 0023

Wokingham

3min Pathing Allowance

a. 0031

d. 0032

p. 0040

p. 0042

Reading

Then Forming 5V92

a. 0045

Schedule Info

Departing Tue 04/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID Y22357 (10489100)
Schedule Type WTT
Duration 01 hrs 23 mins

Train Info

Operated By GWR
Timed For 90mph
Power Type DMU
Timing Load Class 165/166
Service Type Express Passenger (XX)
Characteristics Driver Only Operated (DOO)
Service Code 25521007
Flow Info Reading - Gatwick Airport
Service ID 5350

Passenger Info

Member Info Log In