Train 2K08 Peterborough to Newark North Gate

Operated By East Midlands Railway

Arrived Newark North Gate 1033

Peterborough

Formed from 2T51

Plat 7 SL

d. 0837

0836

1E

p. 0840

0840

RT

Glinton Junction

1min Pathing Allowance

p. 0842

0842

RT

Plat 2

a. 0855

d. 0856

0853

0856

2E

RT

Quadring Signal Ws7071

2min Eng. Allowance

p. 0903

0902

1E

Sleaford South Jn

2min Pathing Allowance

p. 0915

0912

3E

a. 0920

d. 0921

0915

0922

5E

1L

p. 0925

0927

2L

a. 0928

d. 0929

0930

0931

2L

2L

Metheringham

1min Eng. Allowance

a. 0937

d. 0938

0938

0939

1L

1L

Pelham Street Jn.

1min Pathing Allowance

p. 0950

NR

Lincoln

Diesel Power From Here
Speed Increase to 100mph
Timed for E tonnes from here

Plat 4 (booked 5A)

a. 0952

d. 1002

0949

1003

3E

1L

p. 1004

1006

2L

Boultham Jn

1min Eng. Allowance

p. 1005

1006

1L

a. 1010

d. 1010

1011

1011

1L

1L

a. 1016

d. 1017

1017

1019

1L

2L

Collingham

1min Eng. Allowance

a. 1021

d. 1022

1023

1024

2L

2L

p. 1029

1031

2L

Newark North Gate

Then Forming 2T59

Plat 3

a. 1031

1033

2L

Schedule Info

Departing Mon 21/07/2025
Created Wed 21/05/25 20:30
Validity 19/05/25 until 12/12/2025
Schedule ID Y07915 (12574538)
Schedule Type WTT
Duration 01 hrs 54 mins
TRUST ID 452K08MD21
Activated 06:37:53 21/07/25
Call Type Automatic
Sector 28

Train Info

Operated By East Midlands Railway
Timed For 100mph
Power Type DMU
Timing Load Class 158 - 175
Service Type Passenger Service (OO)
Service Code 22812000
Flow Info Peterborough - Spalding - Lincoln - Doncaster
Service ID 4408

Passenger Info

Member Info Log In
Sightings