Train 5R98 Hornsey E.M.U.D. to London Kings Cross

Operated By Thameslink

Arrived London Kings Cross 0410

d. 0321

0344

23L

Harringay Up Rev Sdgs

Driver Changes Ends

a. 0323

d. 0329

NR

NR


SL2

p. 0333

NR

p. 0334

0355

21L

Bowes Park

Stops For Operating Reasons

a. 0336

d. 0336

0356

0356

20L

20L

Bowes Park R.R.L.

Driver Changes Ends

a. 0338

d. 0348

0357

0359

19L

11L

p. 0350

0400

10L

p. 0352

0402

10L

p. 0355

0405

10L

Holloway Sth. Jn.

1min Eng. Allowance

SL

p. 0356

0406

10L

p. 0358

0408

10L

London Kings Cross

Then Forming 2L98

Plat 10

a. 0401

0410

9L

Schedule Info

Departing Fri 09/05/2025
Created Mon 03/02/25 22:00
Validity 06/05/25 until 09/05/2025
Schedule ID W24865 (11852617)
Schedule Type VARCompare WTT
Duration 00 hrs 40 mins
TRUST ID 545R98M309
Activated 01:21:41 09/05/25
Call Type Automatic
Sector 88

Train Info

Operated By Thameslink
Timed For 75mph
Power Type EMU
Timing Load Class 717
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 21788001
Flow Info GN Empty Coaching Stock Movements
Member Info Log In
Sightings