Train 3K07 London Kings Cross to Welwyn Garden City

Operated By Thameslink

London Kings Cross

Formed from 2Y03

Plat 3 CX

d. 0544

p. 0546

p. 0547

Finsbury Park

5min Pathing Allowance

p. 0548

Alexandra Palace

3min Pathing Allowance

Plat 3 SL

p. 0556

New Barnet

3min Pathing Allowance

p. 0603

Hatfield

1min Eng. Allowance

Plat 2 FL

p. 0613

Schedule Info

Departing Wed 30/04/2025
Created Fri 31/01/25 23:01
Validity 29/04/25 until 02/05/2025
Schedule ID W24210 (11823668)
Schedule Type VARCompare WTT
Duration 00 hrs 35 mins

Train Info

Operated By Thameslink
Timed For 75mph
Power Type EMU
Timing Load Class 717
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 21788001
Flow Info GN Empty Coaching Stock Movements
Member Info Log In