Train 2D28 Barry Island to Bargoed

Operated By Transport for Wales

Barry Island

Formed from 2Y36

d. 1219

a. 1222

d. 1224

a. 1226

d. 1227

a. 1229

d. 1230

a. 1234

d. 1235

a. 1236

d. 1237

a. 1239

d. 1241

p. 1242

a. 1244

d. 1245

Penarth Curve South Jn

1min Eng. Allowance

p. 1246

Cardiff Central

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here

a. 1250

d. 1252

a. 1254

d. 1256

p. 1259

a. 1300

d. 1300

a. 1303

d. 1304

a. 1306

d. 1306

Caerphilly

Then Forming 2E32

a. 1311

d. 1312

a. 1313

d. 1314

a. 1316

d. 1316

a. 1319

d. 1319

a. 1324

d. 1325

a. 1327

d. 1327

a. 1330

d. 1331

Gilfach Fargoed

1min Eng. Allowance

a. 1334

d. 1334

Bargoed

Then Forming 2Y54

a. 1338

Schedule Info

Departing Tue 22/04/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID W19946 (10477317)
Schedule Type WTT
Duration 01 hrs 19 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25442000
Flow Info Barry Island - Cardiff Central

Passenger Info

Member Info Log In