Train 2D52 Barry Island to Bargoed

Operated By Transport for Wales

Barry Island

Formed from 2Y72

d. 1819

a. 1822

d. 1824

a. 1826

d. 1827

a. 1829

d. 1830

a. 1834

d. 1835

a. 1836

d. 1837

a. 1839

d. 1841

p. 1842

a. 1844

d. 1845

Penarth Curve South Jn

1min Eng. Allowance

p. 1846

Cardiff Central

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here

a. 1850

d. 1852

a. 1854

d. 1856

p. 1859

a. 1900

d. 1900

a. 1903

d. 1904

a. 1906

d. 1906

Caerphilly

Then Forming 2E56

a. 1911

d. 1912

a. 1913

d. 1914

a. 1916

d. 1916

a. 1919

d. 1919

a. 1924

d. 1925

a. 1927

d. 1927

a. 1930

d. 1931

Gilfach Fargoed

1min Eng. Allowance

a. 1934

d. 1934

Bargoed

Then Forming 2F76

a. 1938

Schedule Info

Departing Tue 22/04/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID W19919 (10477304)
Schedule Type WTT
Duration 01 hrs 19 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25442000
Flow Info Barry Island - Cardiff Central

Passenger Info

Member Info Log In