Train 2B90 Glasgow Central to Lanark

Operated By ScotRail

Glasgow Central

Formed from 2B79

Plat 4 A1

d. 2150

p. 2152

Larkfield Jn

1min Pathing Allowance

FL

p. 2153

Shawfield

3min Pathing Allowance

p. 2156

a. 2202

d. 2203

p. 2204

p. 2205

a. 2207

d. 2207

p. 2208

a. 2211

d. 2211

p. 2213

a. 2217

d. 2219

a. 2222

d. 2222

a. 2225

d. 2226

p. 2229

a. 2231

d. 2232

p. 2237

Lanark

Then Forming 2B91

a. 2242

Schedule Info

Departing Sat 27/07/2024
Created Mon 19/02/24 20:43
Validity 08/06/24 until 14/12/2024
Schedule ID P79582 (8803561)
Schedule Type WTT
Duration 00 hrs 52 mins

Train Info

Operated By ScotRail
Timed For 100mph
Power Type EMU
Timing Load Class 385
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 23563015
Flow Info Argyle Line

Passenger Info

Member Info Log In