Train 2L85 Peterborough to Colchester

Operated By Greater Anglia

Peterborough

Formed from 2E84

d. 2146

p. 2150

a. 2153

d. 2154

Three Horse Shoes

1min Eng. Allowance

p. 2158

p. 2203

a. 2204

d. 2205

p. 2209

a. 2212

d. 2213

Manea Signal Ca924

1min Eng. Allowance

p. 2216

p. 2222

a. 2225

d. 2226

p. 2227

a. 2233

d. 2234

p. 2241

Kennett

1min Eng. Allowance

p. 2244

a. 2254

d. 2255

p. 2306

Stowmarket

Electric Power From Here
Speed Increase to 100mph
Timed for 755 tonnes from here

a. 2309

d. 2310

Claydon

1min Eng. Allowance

p. 2315

a. 2320

d. 2321

Manningtree

1min Eng. Allowance

a. 2330

d. 2331

Colchester

Then Forming 3L85

a. 2340

Schedule Info

Departing Tue 09/07/2024
Created Tue 20/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID L70108 (8832236)
Schedule Type WTT
Duration 01 hrs 54 mins

Train Info

Operated By Greater Anglia
Timed For 100mph
Power Type DMU
Timing Load Class 755
Service Type Passenger Service (OO)
Service Code 21894002
Flow Info Harwich P Quay - Bury St Edmonds/Cambridge/Peterborough

Passenger Info

Member Info Log In