Train 2L83 Peterborough to Colchester

Operated By Greater Anglia

Peterborough

Formed from 2E82

d. 1950

p. 1954

a. 1957

d. 1958

Three Horse Shoes

1min Eng. Allowance

p. 2002

p. 2007

a. 2008

d. 2009

p. 2013

a. 2016

d. 2017

Manea Signal Ca924

1min Eng. Allowance
1min Pathing Allowance

p. 2020

p. 2027

a. 2031

d. 2032

p. 2033

a. 2038

d. 2039

p. 2046

Kennett

1min Eng. Allowance

p. 2049

a. 2059

d. 2100

p. 2111

Stowmarket

Electric Power From Here
Speed Increase to 100mph
Timed for 755 tonnes from here

a. 2114

d. 2115

Claydon

1min Eng. Allowance
1min Pathing Allowance

p. 2120

a. 2127

d. 2130

Manningtree

1min Eng. Allowance
2min Pathing Allowance

a. 2138

d. 2139

Colchester

Then Forming 5L83

a. 2151

Schedule Info

Departing Thu 11/07/2024
Created Tue 20/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID L70105 (8832235)
Schedule Type WTT
Duration 02 hrs 01 mins

Train Info

Operated By Greater Anglia
Timed For 100mph
Power Type DMU
Timing Load Class 755
Service Type Passenger Service (OO)
Service Code 21894002
Flow Info Harwich P Quay - Bury St Edmonds/Cambridge/Peterborough

Passenger Info

Member Info Log In