Train 1B29 York to Blackpool North

Operated By Northern

York

Formed from 1B24

Plat 7 LSL

d. 1323

LSL

p. 1328

a. 1333

d. 1334

a. 1342

d. 1343

Cross Gates

1min Performance Allowance

p. 1346

p. 1349

Leeds

Diesel Power From Here
Speed Increase to 100mph
Timed for 195 tonnes from here

a. 1352

d. 1357

Whitehall Jn

1min Pathing Allowance

p. 1358

a. 1406

d. 1407

p. 1413

Bradford Interchange

Driver Changes Ends

Plat 4 E

a. 1415

d. 1418

p. 1419

a. 1428

d. 1430

p. 1431

p. 1434

Hebden Bridge

1min Performance Allowance

a. 1439

d. 1441

p. 1447

p. 1454

p. 1504

a. 1510

d. 1512

p. 1517

a. 1519

d. 1521

Lostock Hall Jn

1min Eng. Allowance

p. 1530

p. 1534

DSL

p. 1536

a. 1538

d. 1540

a. 1549

d. 1550

a. 1557

d. 1558

Devonshire Road Jn

1min Eng. Allowance

p. 1601

Blackpool North

Then Forming 1B36

a. 1604

Schedule Info

Departing Thu 11/07/2024
Created Mon 19/02/24 20:43
Validity 03/06/24 until 14/12/2024
Schedule ID G36493 (8787648)
Schedule Type WTT
Duration 02 hrs 41 mins

Train Info

Operated By Northern
Timed For 100mph
Power Type DMU
Timing Load Class 195
Service Type Express Passenger (XX)
Service Code 11837920
Flow Info Leeds - York (WY PTE & DTP)
Service ID 2116

Passenger Info

Member Info Log In