Train 2A02 Knottingley to Leeds

Operated By Northern

a. 0732

d. 0733

a. 0735

d. 0735

a. 0739

d. 0740

a. 0743

d. 0743

p. 0746

p. 0747

Calder Bridge Jn

1min Eng. Allowance

p. 0749

Wakefield Kirkgate

1min Pathing Allowance

a. 0752

d. 0758

Wakefield Westgate

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here

a. 0802

d. 0803

Outwood

1min Eng. Allowance

a. 0807

d. 0808

p. 0817

Leeds

Then Forming 2A07

a. 0819

Schedule Info

Departing Thu 11/07/2024
Created Mon 19/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID G32127 (8786608)
Schedule Type WTT
Duration 00 hrs 51 mins

Train Info

Operated By Northern
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 11822820
Flow Info Wakefield - Knottingley (WY PTE)
Service ID 3304

Passenger Info

Member Info Log In