Train 2L79 Peterborough to Ipswich

Operated By Greater Anglia

Peterborough

Formed from 2E78

d. 1550

p. 1554

a. 1557

d. 1558

Three Horse Shoes

1min Eng. Allowance

p. 1602

p. 1607

a. 1608

d. 1609

p. 1613

a. 1616

d. 1617

Manea Signal Ca924

1min Eng. Allowance

p. 1620

Ely North Jn

1min Pathing Allowance

UL

p. 1627

a. 1630

d. 1631

p. 1632

a. 1638

d. 1639

p. 1646

Kennett

1min Eng. Allowance

p. 1649

a. 1658

d. 1659

p. 1710

Stowmarket

Electric Power From Here
Speed Increase to 100mph
Timed for 755 tonnes from here

a. 1713

d. 1714

Claydon

1min Eng. Allowance

p. 1719

a. 1727

Schedule Info

Departing Wed 10/07/2024
Created Tue 20/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID C34725 (8823215)
Schedule Type WTT
Duration 01 hrs 37 mins

Train Info

Operated By Greater Anglia
Timed For 100mph
Power Type DMU
Timing Load Class 755
Service Type Passenger Service (OO)
Service Code 21894002
Flow Info Harwich P Quay - Bury St Edmonds/Cambridge/Peterborough

Passenger Info

Member Info Log In