Train 9R47 Bedford to Three Bridges

Operated By Thameslink

d. 1734

p. 1736

a. 1744

d. 1745

a. 1748

d. 1749

p. 1750

p. 1753

a. 1754

d. 1754

a. 1757

d. 1759

a. 1801

d. 1802

a. 1807

d. 1808

p. 1808

a. 1812

d. 1813

p. 1817

p. 1822

Carlton Road Jn

1min Eng. Allowance

p. 1826

Kentish Town

1min Eng. Allowance

Plat 1 MOL

p. 1828

Dock Jn North

1min Performance Allowance

SB

p. 1831

a. 1838

d. 1839

a. 1840

d. 1841

London Blackfriars

Electric Power From Here
Speed Increase to 100mph
Timed for 700 tonnes from here

Plat 1 DSS

a. 1843

d. 1844

Metropolitan Jn

2min Performance Allowance

DSH

p. 1846

a. 1850

d. 1851

p. 1858

a. 1901

d. 1902

p. 1904

p. 1904

a. 1905

d. 1906

a. 1908

d. 1909

a. 1912

d. 1913

p. 1915

a. 1921

d. 1922

a. 1924

d. 1925

a. 1928

d. 1928

a. 1931

d. 1932

a. 1934

d. 1935

Schedule Info

Departing Sat 05/07/2025
Created Thu 23/01/25 22:21
Validity 24/05/25 until 13/12/2025
Schedule ID Y36772 (11737683)
Schedule Type WTT
Duration 02 hrs 06 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Express Passenger (XX)
Characteristics Driver Only Operated (DOO)
Service Code 22720000
Flow Info Thameslink Mainline North (Bedford - Brighton)

Passenger Info

Member Info Log In