Train 5S49 Brighton to Three Bridges Tl Up Depot

Operated By Thameslink

Arrived Three Bridges Tl Up Depot 2010

Plat 4 UML

d. 1944

1943

1E

p. 1947

1946

1E

p. 1953

1952

1E

Keymer Jn

3min Pathing Allowance

p. 1953

1952

1E

p. 1959

1958

1E

p. 1959

1958

1E

p. 2004

2005

1L

Three Bridges Signal T288

Stops For Operating Reasons

a. 2006

d. 2006

2008

2008

2L

2L

a. 2017

2010

7E

Schedule Info

Departing Wed 16/07/2025
Created Thu 23/01/25 22:21
Validity 19/05/25 until 12/12/2025
Schedule ID Y35253 (11730867)
Schedule Type WTT
Duration 00 hrs 33 mins
TRUST ID 875S49MY16
Activated 17:44:17 16/07/25
Call Type Automatic
Sector 88

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 22788002
Flow Info Thameslink Empty Coach Stock Movements
Member Info Log In
Sightings