Train 5S49 Brighton to Three Bridges Tl Up Depot

Operated By Thameslink

d. 1944

Keymer Jn

3min Pathing Allowance

p. 1953

p. 1959

p. 2004

Three Bridges Signal T288

Stops For Operating Reasons

a. 2006

d. 2006

Schedule Info

Departing Wed 18/06/2025
Created Thu 23/01/25 22:21
Validity 19/05/25 until 12/12/2025
Schedule ID Y35253 (11730867)
Schedule Type WTT
Duration 00 hrs 33 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 22788002
Flow Info Thameslink Empty Coach Stock Movements
Member Info Log In