Train 1P65 London Bridge to Caterham

Operated By Southern

p. 2112

p. 2114

p. 2118

Norwood Junction

1min Pathing Allowance

Plat 5 SL

a. 2122

d. 2123

p. 2126

a. 2127

d. 2128

a. 2130

d. 2131

a. 2133

d. 2134

Purley

Stops to Uncouple Vehicles
Divides Forming 2P65

a. 2137

d. 2141

a. 2143

d. 2144

a. 2147

d. 2147

a. 2149

d. 2149

a. 2154

Schedule Info

Departing Sat 05/07/2025
Created Thu 23/01/25 22:21
Validity 24/05/25 until 13/12/2025
Schedule ID Y29813 (11735506)
Schedule Type WTT
Duration 00 hrs 44 mins

Train Info

Operated By Southern
Timed For 100mph
Power Type EMU
Service Type Express Passenger (XX)
Characteristics Driver Only Operated (DOO)
Service Code 24786000
Flow Info London - South London Metro Fast Via East Croydon
Service ID 4932

Passenger Info

Member Info Log In