Train 1P38 Great Malvern to London Paddington

Operated By GWR

d. 1632

a. 1634

d. 1635

Newland East Signal Box

1min Eng. Allowance

p. 1638

p. 1643

a. 1648

d. 1653

Norton Jn

May Stop to Allow Train to Pass

p. 1656

a. 1657

d. 1659

a. 1703

d. 1705

Evesham

May Stop to Allow Train to Pass

a. 1711

d. 1714

a. 1719

d. 1721

a. 1731

d. 1748

a. 1755

d. 1757

Charlbury

May Stop to Allow Train to Pass

a. 1805

d. 1807

Hanborough

1min Eng. Allowance
1min Pathing Allowance

a. 1813

d. 1814

Wolvercote Jn

May Stop to Allow Train to Pass

UML

p. 1820

p. 1823

a. 1825

d. 1832

p. 1834

Kennington Jn

1min Eng. Allowance
2min Pathing Allowance

p. 1835

p. 1843

Didcot Parkway

Electric Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here
Trolley Service Available

Plat 5 ML

a. 1845

d. 1847

p. 1848

Goring & Streatley

1min Eng. Allowance

ML

p. 1853

a. 1900

d. 1903

p. 1904

p. 1907

p. 1911

p. 1914

p. 1917

p. 1917

Southall

1min Pathing Allowance

Plat 2 ML

p. 1918

Acton West

1min Eng. Allowance
1min Pathing Allowance

ML

p. 1921

p. 1926

p. 1927

Schedule Info

Departing Tue 04/02/2025
Created Thu 30/01/25 21:40
Validity 16/12/24 until 16/05/2025
Schedule ID Y22305 (11808041)
Schedule Type WTT
Duration 02 hrs 57 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type DMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25392003
Flow Info London - Worcester/Hereford
Service ID 7456

Passenger Info

Member Info Log In