Train 1P26 Great Malvern to London Paddington

Operated By GWR

d. 1059

a. 1101

d. 1102

Newland East Signal Box

1min Eng. Allowance

p. 1104

p. 1109

a. 1115

d. 1118

p. 1121

a. 1122

d. 1124

a. 1128

d. 1129

a. 1135

d. 1137

a. 1142

d. 1144

a. 1154

d. 1155

a. 1202

d. 1203

a. 1211

d. 1213

Hanborough

1min Eng. Allowance

a. 1219

d. 1220

p. 1225

p. 1228

a. 1230

d. 1232

p. 1234

Kennington Jn

1min Eng. Allowance

p. 1235

Didcot North Jn

1min Pathing Allowance

p. 1241

Didcot Parkway

Electric Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here
Trolley Service Available
1min Pathing Allowance

Plat 5 ML

a. 1244

d. 1246

p. 1248

Goring & Streatley

1min Eng. Allowance

ML

p. 1253

a. 1300

d. 1302

p. 1303

p. 1306

p. 1309

p. 1312

p. 1315

p. 1316

p. 1317

Acton West

1min Eng. Allowance

ML

p. 1319

p. 1322

p. 1324

Schedule Info

Departing Thu 13/03/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID Y22295 (10489039)
Schedule Type WTT
Duration 02 hrs 26 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type DMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25392003
Flow Info London - Worcester/Hereford
Service ID 7432

Passenger Info

Member Info Log In