Train 1G29 London Paddington to Worcester Shrub Hill

Operated By GWR

p. 1937

p. 1939

p. 1941

p. 1943

p. 1944

p. 1948

p. 1951

Twyford

1min Eng. Allowance

Plat 1 ML

p. 1954

p. 1957

a. 1959

d. 2001

Goring & Streatley

1min Eng. Allowance
1min Pathing Allowance

ML

p. 2007

Didcot Parkway

1min Pathing Allowance

p. 2013

p. 2018

p. 2020

Uffington (Oxfordshire)

1min Eng. Allowance

p. 2021

Swindon

Diesel Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here
Trolley Service Available

a. 2029

d. 2031

a. 2042

d. 2044

a. 2058

d. 2100

a. 2103

d. 2104

Standish Jn

1min Eng. Allowance

p. 2107

p. 2114

Gloucester

Driver Changes Ends

a. 2115

d. 2125

p. 2126

p. 2127

a. 2132

d. 2134

Abbotswood Jn

1min Eng. Allowance
4min Pathing Allowance

p. 2151

p. 2200

Schedule Info

Departing Tue 04/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID Y22150 (10488897)
Schedule Type WTT
Duration 02 hrs 30 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type EMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25390003
Flow Info London - Cheltenham
Service ID 3329

Passenger Info

Member Info Log In