Train 1B22 London Paddington to Carmarthen

Operated By GWR

p. 1619

p. 1621

p. 1623

p. 1625

p. 1626

p. 1630

p. 1633

Twyford

1min Eng. Allowance

Plat 1 ML

p. 1636

p. 1639

p. 1640

Goring & Streatley

1min Eng. Allowance

ML

p. 1646

p. 1655

p. 1657

Uffington (Oxfordshire)

1min Eng. Allowance

p. 1658

p. 1705

Hullavington

1min Eng. Allowance

p. 1716

p. 1723

a. 1726

d. 1728

p. 1729

p. 1732

Severn Tunnel West

1min Pathing Allowance

p. 1736

p. 1745

a. 1746

d. 1752

Ebbw Jn

1min Pathing Allowance

p. 1755

Marshfield

1min Eng. Allowance

p. 1758

p. 1803

Cardiff Central

Diesel Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here
Trolley Service Available

Plat 3 D

a. 1806

d. 1809

p. 1820

a. 1827

d. 1829

Stormy

2min Pathing Allowance

p. 1833

p. 1839

a. 1842

d. 1844

p. 1848

Neath

1min Eng. Allowance

a. 1850

d. 1853

Swansea

Driver Changes Ends
Trolley Service Ends Here

a. 1904

d. 1910

p. 1919

p. 1923

a. 1925

d. 1927

a. 1932

d. 1934

p. 1939

Ferryside

1min Eng. Allowance

p. 1943

p. 1952

a. 1954

Schedule Info

Departing Thu 13/03/2025
Created Thu 31/10/24 21:00
Validity 16/12/24 until 16/05/2025
Schedule ID Y21978 (10973220)
Schedule Type WTT
Duration 03 hrs 36 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type EMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25375002
Flow Info London - Cardiff/Swansea
Service ID 6341

Passenger Info

Member Info Log In