Train 1A89 Exeter St Davids to London Paddington

Operated By GWR

p. 1553

p. 1557

a. 1604

d. 1605

p. 1610

a. 1624

d. 1626

p. 1635

Clink Road Jn

1min Eng. Allowance

p. 1636

Fairwood Jn

1min Pathing Allowance

p. 1640

a. 1644

d. 1646

p. 1648

p. 1653

p. 1659

a. 1702

d. 1704

p. 1712

Hungerford

1min Eng. Allowance

a. 1716

d. 1718

Newbury

Electric Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here
Trolley Service Available

a. 1726

d. 1727

Theale

1min Eng. Allowance

p. 1735

p. 1739

p. 1740

a. 1742

d. 1744

p. 1745

p. 1748

p. 1752

p. 1755

p. 1758

p. 1758

p. 1759

Acton West

1min Eng. Allowance

ML

p. 1801

p. 1804

p. 1806

Schedule Info

Departing Fri 14/03/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID Y21951 (10488690)
Schedule Type WTT
Duration 02 hrs 25 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type DMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25397003
Flow Info London - Plymouth/Penzance
Service ID 1436

Passenger Info

Member Info Log In