Train 9W21 Bedford to Brighton

Operated By Thameslink

d. 2337

p. 2339

a. 2347

d. 2348

a. 2351

d. 2352

p. 2353

p. 2356

a. 2357

d. 2358

a. 0001

d. 0002

a. 0004

d. 0005

a. 0010

d. 0011

Harpenden Jn

1min Eng. Allowance

p. 0011

a. 0016

d. 0017

a. 0022

d. 0023

p. 0023

a. 0026

d. 0026

a. 0029

d. 0030

a. 0033

d. 0034

a. 0035

d. 0036

Cricklewood

1min Eng. Allowance

a. 0037

d. 0039

p. 0044

Kentish Town

1min Eng. Allowance

Plat 1 MOL

a. 0046

d. 0046

Dock Jn North

1min Performance Allowance

SB

p. 0049

Farringdon

Stops For Operating Reasons

a. 0057

d. 0058

London Blackfriars

Electric Power From Here
Speed Increase to 100mph
Timed for 700 tonnes from here

Plat 1 DSH

a. 0101

d. 0102

p. 0103

Elephant & Castle

1min Performance Allowance

p. 0104

p. 0108

p. 0111

p. 0115

p. 0117

p. 0124

p. 0125

a. 0126

d. 0128

a. 0133

d. 0134

Stoats Nest Jn.

2min Performance Allowance

SL

p. 0136

Redhill

1min Performance Allowance

p. 0146

p. 0150

Horley

1min Performance Allowance

a. 0152

d. 0152

a. 0156

d. 0158

a. 0202

d. 0204

p. 0207

p. 0211

a. 0213

d. 0214

p. 0217

a. 0228

Schedule Info

Departing Sat 05/07/2025
Created Thu 23/01/25 22:21
Validity 24/05/25 until 13/12/2025
Schedule ID Y11543 (11734946)
Schedule Type WTT
Duration 02 hrs 51 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Express Passenger (XX)
Characteristics Driver Only Operated (DOO)
Service Code 22720000
Flow Info Thameslink Mainline North (Bedford - Brighton)

Passenger Info

Member Info Log In