Train 9W19 Bedford to Three Bridges

Operated By Thameslink

d. 2307

p. 2309

a. 2317

d. 2318

a. 2321

d. 2322

p. 2323

p. 2326

a. 2327

d. 2328

a. 2331

d. 2332

a. 2334

d. 2335

a. 2340

d. 2341

Harpenden Jn

1min Eng. Allowance

p. 2341

a. 2346

d. 2347

a. 2352

d. 2353

p. 2353

a. 2356

d. 2356

a. 0001

d. 0001

a. 0004

d. 0005

a. 0006

d. 0007

a. 0008

d. 0010

Carlton Road Jn

1min Eng. Allowance

p. 0014

Kentish Town

1min Eng. Allowance

Plat 1 MOL

a. 0017

d. 0017

Dock Jn North

1min Performance Allowance

SB

p. 0020

a. 0027

d. 0028

London Blackfriars

Electric Power From Here
Speed Increase to 100mph
Timed for 700 tonnes from here

Plat 1 DSH

a. 0031

d. 0032

p. 0033

Elephant & Castle

1min Performance Allowance

p. 0034

p. 0038

p. 0041

p. 0045

p. 0047

Selhurst

1min Pathing Allowance

p. 0054

p. 0056

a. 0057

d. 0058

p. 0103

Stoats Nest Jn.

1min Pathing Allowance

SL

p. 0105

Redhill

1min Pathing Allowance

p. 0112

p. 0116

Horley

1min Performance Allowance

a. 0118

d. 0118

a. 0122

d. 0123

Schedule Info

Departing Sat 05/07/2025
Created Thu 23/01/25 22:21
Validity 24/05/25 until 13/12/2025
Schedule ID Y11539 (11734945)
Schedule Type WTT
Duration 02 hrs 21 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Express Passenger (XX)
Characteristics Driver Only Operated (DOO)
Service Code 22720000
Flow Info Thameslink Mainline North (Bedford - Brighton)

Passenger Info

Member Info Log In