Train 5Y18 London Charing Cross to Grove Park Down C.H.S.

Operated By Southeastern

p. 1033

London Bridge

1min Pathing Allowance

Plat 7 7

p. 1034

p. 1038

p. 1040

p. 1042

p. 1044

p. 1046

p. 1049

Orpington

Stops For Operating Reasons
Driver Changes Ends
1min Pathing Allowance

Plat 4 SL

a. 1052

d. 1059

Petts Wood Jn

2min Pathing Allowance

p. 1102

Chislehurst

5min Pathing Allowance

p. 1105

p. 1112

Schedule Info

Departing Wed 05/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID W86297 (10486010)
Schedule Type WTT
Duration 00 hrs 51 mins

Train Info

Operated By Southeastern
Timed For 75mph
Power Type EMU
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 24602004
Flow Info London - Hastings Via Tonbridge
Member Info Log In