Train 1P58 Caterham to London Bridge

Operated By Southern

Caterham

Formed from 1P53

d. 1925

a. 1928

d. 1929

a. 1930

d. 1931

Kenley

1min Performance Allowance

a. 1933

d. 1934

Purley

Stops to Couple Vehicles
Joins with 2P58

Plat 5 SL

a. 1938

d. 1948

a. 1950

d. 1950

a. 1953

d. 1953

a. 1955

d. 1956

p. 1957

p. 1958

p. 2002

p. 2006

p. 2009

London Bridge

Then Forming 1K61

a. 2012

Schedule Info

Departing Tue 04/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID W37291 (10481232)
Schedule Type WTT
Duration 00 hrs 47 mins

Train Info

Operated By Southern
Timed For 100mph
Power Type EMU
Service Type Express Passenger (XX)
Characteristics Driver Only Operated (DOO)
Service Code 24786000
Flow Info London - South London Metro Fast Via East Croydon
Service ID 1933

Passenger Info

Member Info Log In