Train 2W42 Southport to Stalybridge

Operated By Northern

d. 0626

a. 0631

d. 0632

a. 0636

d. 0637

a. 0640

d. 0641

a. 0643

d. 0644

a. 0647

d. 0648

a. 0650

d. 0651

a. 0655

d. 0655

a. 0658

d. 0659

a. 0704

d. 0707

a. 0711

d. 0712

p. 0713

a. 0716

d. 0717

p. 0721

a. 0725

d. 0726

p. 0727

a. 0729

d. 0729

Kearsley

2min Eng. Allowance

a. 0731

d. 0731

a. 0741

d. 0742

a. 0744

d. 0746

p. 0747

Manchester Victoria

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here

a. 0749

d. 0751

p. 0754

p. 0754

p. 0755

p. 0759

a. 0800

d. 0801

Stalybridge

Then Forming 2W07

a. 0804

Schedule Info

Departing Fri 19/04/2024
Created Tue 15/08/23 00:10
Validity 11/03/24 until 01/06/2024
Schedule ID W34245 (6853204)
Schedule Type WTT
Duration 01 hrs 38 mins

Train Info

Operated By Northern
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 12224820
Flow Info Manchester Ox Rd/Manchester Vic - Bolton - Wigan Wallgate - Southport
Service ID 9495

Passenger Info

Member Info Log In