Train 1Y21 Leeds to Nottingham

Operated By Northern

Leeds

Formed from 1L56

d. 1409

p. 1410

p. 1411

p. 1414

p. 1418

p. 1419

a. 1424

d. 1425

p. 1429

Woolley Coal Sdgs S.B.

1min Performance Allowance

p. 1434

a. 1440

d. 1441

Ecclesfield West S.B.

1min Performance Allowance

p. 1451

a. 1455

d. 1457

Wincobank Jn.

1min Eng. Allowance

p. 1457

p. 1502

a. 1504

d. 1506

p. 1511

a. 1515

d. 1516

p. 1520

a. 1521

d. 1522

p. 1524

p. 1526

a. 1532

d. 1533

p. 1536

a. 1539

d. 1540

Ilkeston

1min Eng. Allowance

a. 1544

d. 1545

p. 1548

Radford Jn

1min Pathing Allowance

UM

p. 1554

p. 1557

Nottingham

Then Forming 1Y24

a. 1559

Schedule Info

Departing Sat 20/04/2024
Created Tue 15/08/23 00:10
Validity 16/12/23 until 01/06/2024
Schedule ID W30170 (6850502)
Schedule Type WTT
Duration 01 hrs 50 mins

Train Info

Operated By Northern
Timed For 100mph
Power Type DMU
Timing Load Class 195
Service Type Express Passenger (XX)
Service Code 21865000
Flow Info Nottingham - Sheffield - Leeds
Service ID 1145

Passenger Info

Member Info Log In