Train 1Y11 Leeds to Nottingham

Operated By Northern

Leeds

Formed from 1L36

d. 0909

p. 0910

p. 0911

p. 0914

p. 0918

p. 0919

a. 0924

d. 0925

p. 0929

Woolley Coal Sdgs S.B.

1min Performance Allowance

p. 0934

a. 0940

d. 0941

Ecclesfield West S.B.

1min Performance Allowance

p. 0951

a. 0955

d. 0957

Wincobank Jn.

1min Eng. Allowance

p. 0957

p. 1002

a. 1004

d. 1007

p. 1012

a. 1016

d. 1017

p. 1021

a. 1022

d. 1023

p. 1024

p. 1026

a. 1032

d. 1033

p. 1036

a. 1039

d. 1040

Ilkeston

1min Eng. Allowance

a. 1044

d. 1045

p. 1048

Radford Jn

1min Pathing Allowance

UM

p. 1054

p. 1057

Nottingham

Then Forming 1Y14

a. 1059

Schedule Info

Departing Sat 20/04/2024
Created Tue 15/08/23 00:10
Validity 16/12/23 until 01/06/2024
Schedule ID W30145 (6850492)
Schedule Type WTT
Duration 01 hrs 50 mins

Train Info

Operated By Northern
Timed For 100mph
Power Type DMU
Timing Load Class 195
Service Type Express Passenger (XX)
Service Code 21865000
Flow Info Nottingham - Sheffield - Leeds
Service ID 1121

Passenger Info

Member Info Log In