Train 9R50 Gatwick Airport to Bedford

Operated By Thameslink

d. 1656

p. 1659

a. 1704

d. 1706

p. 1712

a. 1714

d. 1715

South Croydon

1min Pathing Allowance

a. 1718

d. 1719

East Croydon

1min Pathing Allowance

a. 1722

d. 1723

p. 1725

p. 1726

p. 1730

Bricklayers Arms Jn

1min Performance Allowance

p. 1734

p. 1736

a. 1738

d. 1741

Metropolitan Jn

1min Performance Allowance

p. 1742

p. 1745

a. 1746

d. 1747

a. 1748

d. 1749

a. 1750

d. 1751

St Pancras International

Electric Power From Here
Speed Increase to 100mph
Timed for 700 tonnes from here
1min Performance Allowance

a. 1755

d. 1756

p. 1758

p. 1800

p. 1801

Hendon

1min Pathing Allowance

Plat 4 FL

p. 1805

p. 1811

St Albans City

2min Pathing Allowance

a. 1817

d. 1819

p. 1825

a. 1826

d. 1827

Luton Airport Parkway

1min Eng. Allowance

a. 1832

d. 1833

a. 1836

d. 1837

a. 1840

d. 1841

p. 1842

a. 1845

d. 1846

Flitwick

1min Performance Allowance

a. 1849

d. 1850

Bedford South Jn.

1min Eng. Allowance

DSL

p. 1858

a. 1902

Schedule Info

Departing Tue 04/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID W26057 (10479868)
Schedule Type WTT
Duration 02 hrs 06 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Express Passenger (XX)
Characteristics Driver Only Operated (DOO)
Service Code 22729000
Flow Info Thameslink

Passenger Info

Member Info Log In