Train 5S54 Brighton to Three Bridges Tl Up Depot

Operated By Thameslink

Arrived Three Bridges Tl Up Depot 2104

Plat 4 UML

d. 2044

2033

11E

p. 2047

2037

10E

p. 2053

2044

9E

Keymer Jn

3min Pathing Allowance

p. 2053

2044

9E

p. 2059

2052

7E

p. 2059

2052

7E

p. 2104

2100

4E

Three Bridges Signal T288

Stops For Operating Reasons

a. 2106

d. 2106

2102

2102

4E

4E

a. 2117

2104

13E

Schedule Info

Departing Fri 09/05/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID W24895 (10479362)
Schedule Type WTT
Duration 00 hrs 33 mins
TRUST ID 875S54MZ09
Activated 18:44:14 09/05/25
Call Type Automatic
Sector 88

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 22788002
Flow Info Thameslink Empty Coach Stock Movements
Member Info Log In
Sightings