Train 5S54 Brighton to Three Bridges Tl Up Depot

Operated By Thameslink

d. 2044

Keymer Jn

3min Pathing Allowance

p. 2053

p. 2059

p. 2104

Three Bridges Signal T288

Stops For Operating Reasons

a. 2106

d. 2106

Schedule Info

Departing Mon 10/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID W24895 (10479362)
Schedule Type WTT
Duration 00 hrs 33 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 22788002
Flow Info Thameslink Empty Coach Stock Movements
Member Info Log In