Train 1H42 London Charing Cross to Hastings

Operated By Southeastern

p. 1450

a. 1452

d. 1454

p. 1456

p. 1459

p. 1501

p. 1502

p. 1504

p. 1507

a. 1509

d. 1510

a. 1519

d. 1520

a. 1525

d. 1526

a. 1529

d. 1531

a. 1536

d. 1536

a. 1539

d. 1541

a. 1545

d. 1545

a. 1549

d. 1550

a. 1556

d. 1556

a. 1600

d. 1601

Robertsbridge

2min Pathing Allowance

a. 1604

d. 1605

a. 1614

d. 1615

a. 1618

d. 1618

a. 1623

d. 1624

p. 1624

a. 1630

Schedule Info

Departing Wed 05/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID W13001 (10475214)
Schedule Type WTT
Duration 01 hrs 45 mins

Train Info

Operated By Southeastern
Timed For 100mph
Power Type EMU
Service Type Express Passenger (XX)
Service Code 24602004
Flow Info London - Hastings Via Tonbridge
Service ID 2142

Passenger Info

Member Info Log In