Train 1H54 Hastings to London Charing Cross

Operated By Southeastern

d. 0515

p. 0520

a. 0521

d. 0522

a. 0527

d. 0528

a. 0531

d. 0532

a. 0538

d. 0539

a. 0542

d. 0543

a. 0548

d. 0548

a. 0554

d. 0555

Frant

1min Pathing Allowance

a. 0558

d. 0559

a. 0604

d. 0606

a. 0609

d. 0610

Tonbridge

1min Performance Allowance

a. 0615

d. 0617

Sevenoaks

2min Pathing Allowance

a. 0625

d. 0627

a. 0637

d. 0638

p. 0640

p. 0643

p. 0646

p. 0648

p. 0650

a. 0653

d. 0655

Schedule Info

Departing Tue 04/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID W12988 (10475201)
Schedule Type WTT
Duration 01 hrs 48 mins

Train Info

Operated By Southeastern
Timed For 100mph
Power Type EMU
Service Type Express Passenger (XX)
Service Code 24602000
Flow Info London - Hastings Via Tonbridge-Peak Trains
Service ID 2254

Passenger Info

Member Info Log In