Train 5F94 Grove Park Up C.H.S. to London Charing Cross

Operated By Southeastern

Grove Park Up Sg Ln Ed Ext

Stops For Operating Reasons

a. 1717

d. 1717

p. 1719

p. 1721

p. 1723

p. 1725

London Bridge

1min Pathing Allowance

Plat 8 UCX

p. 1728

Ewer Street Junction

2min Pathing Allowance

SL

p. 1730

London Waterloo (East)

4min Pathing Allowance

p. 1735

Schedule Info

Departing Tue 04/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID W12466 (10474724)
Schedule Type WTT
Duration 00 hrs 32 mins

Train Info

Operated By Southeastern
Timed For 75mph
Power Type EMU
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 24655005
Flow Info London-Orpington/Sevenoaks Via Grove Park
Member Info Log In