Train 1N12 London Charing Cross to Gravesend

Operated By Southeastern

p. 1725

a. 1727

d. 1729

p. 1731

p. 1734

Tanners Hill Junction (Nx)

1min Pathing Allowance

p. 1735

p. 1737

a. 1740

d. 1741

Lee

a. 1742

d. 1743

a. 1746

d. 1747

a. 1749

d. 1750

a. 1752

d. 1753

a. 1755

d. 1756

a. 1758

d. 1759

a. 1801

d. 1802

p. 1804

p. 1805

a. 1806

d. 1808

a. 1811

d. 1812

a. 1813

d. 1814

a. 1817

d. 1817

a. 1819

d. 1820

Gravesend

Then Forming 1D30

a. 1824

Schedule Info

Departing Tue 04/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID W12389 (10474657)
Schedule Type WTT
Duration 01 hrs 04 mins

Train Info

Operated By Southeastern
Timed For 75mph
Power Type EMU
Service Type Express Passenger (XX)
Characteristics Driver Only Operated (DOO)
Service Code 24657000
Flow Info London - Gillingham Via Sidcup- Peak Trains

Passenger Info

Member Info Log In