Train 5Y82 Tonbridge Jubilee Sidings to London Bridge

Operated By Southeastern

d. 1323

Tonbridge

Stops For Operating Reasons

a. 1325

d. 1332

Edenbridge

3min Pathing Allowance

p. 1339

Godstone

2min Pathing Allowance

p. 1347

Redhill

Stops For Operating Reasons
Crew Change (if necessary)

a. 1355

d. 1356

p. 1403

p. 1404

p. 1406

East Croydon

1min Pathing Allowance

p. 1407

p. 1409

Norwood Fork Jn.

1min Pathing Allowance

FL

p. 1410

p. 1412

p. 1414

p. 1417

p. 1418

p. 1421

p. 1421

a. 1424

Schedule Info

Departing Thu 28/03/2024
Created Thu 21/09/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID W05261 (7257590)
Schedule Type WTT
Duration 01 hrs 01 mins

Train Info

Operated By Southeastern
Timed For 100mph
Power Type EMU
Service Type Empty Coaching Stock (ECS) (EE)
Service Code 24602004
Flow Info London - Hastings Via Tonbridge
Member Info Log In