Train 2D84 Dartford to London Charing Cross

Operated By Southeastern

Dartford

Formed from 2N68

Plat 1 UML

d. 1424

p. 1425

p. 1427

a. 1428

d. 1428

a. 1431

d. 1431

a. 1434

d. 1435

a. 1438

d. 1438

a. 1440

d. 1441

Lee

a. 1444

d. 1444

a. 1446

d. 1447

p. 1449

Lewisham

1min Pathing Allowance

a. 1451

d. 1452

p. 1454

p. 1455

p. 1456

p. 1458

a. 1501

d. 1503

p. 1505

London Waterloo (East)

1min Pathing Allowance

a. 1507

d. 1508

a. 1512

Schedule Info

Departing Sat 27/04/2024
Created Tue 23/01/24 20:41
Validity 16/12/23 until 01/06/2024
Schedule ID W01766 (8517674)
Schedule Type WTT
Duration 00 hrs 48 mins

Train Info

Operated By Southeastern
Timed For 75mph
Power Type EMU
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 24657005
Flow Info London - Gillingham Via Sidcup

Passenger Info

Member Info Log In