Train 2D32 Dartford to London Charing Cross

Operated By Southeastern

Dartford

Formed from 2N16

Plat 1 UML

d. 0754

p. 0755

p. 0757

a. 0758

d. 0758

a. 0801

d. 0801

a. 0804

d. 0805

a. 0808

d. 0808

a. 0810

d. 0811

Lee

a. 0814

d. 0814

a. 0816

d. 0817

p. 0819

a. 0821

d. 0822

p. 0823

p. 0824

p. 0825

p. 0827

a. 0830

d. 0832

p. 0834

London Waterloo (East)

1min Pathing Allowance

a. 0836

d. 0837

a. 0841

Schedule Info

Departing Sat 27/04/2024
Created Tue 23/01/24 20:41
Validity 16/12/23 until 01/06/2024
Schedule ID W01543 (8517629)
Schedule Type WTT
Duration 00 hrs 47 mins

Train Info

Operated By Southeastern
Timed For 75mph
Power Type EMU
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 24657005
Flow Info London - Gillingham Via Sidcup

Passenger Info

Member Info Log In