Train 1H52 Hastings to London Charing Cross

Operated By Southeastern

d. 1421

a. 1423

d. 1424

p. 1426

a. 1434

d. 1435

p. 1439

p. 1441

p. 1449

a. 1450

d. 1451

Strawberry Hill Tunnel

1min Performance Allowance

p. 1456

a. 1459

d. 1502

p. 1503

a. 1505

d. 1506

p. 1509

a. 1511

d. 1513

a. 1520

d. 1522

a. 1530

d. 1531

p. 1533

p. 1534

p. 1536

p. 1537

p. 1539

p. 1540

p. 1541

p. 1543

a. 1546

d. 1548

p. 1550

a. 1552

d. 1553

a. 1556

Schedule Info

Departing Thu 28/03/2024
Created Tue 30/01/24 20:41
Validity 11/12/23 until 31/05/2024
Schedule ID W00352 (8612388)
Schedule Type WTT
Duration 01 hrs 35 mins

Train Info

Operated By Southeastern
Timed For 100mph
Power Type EMU
Service Type Express Passenger (XX)
Service Code 24602004
Flow Info London - Hastings Via Tonbridge
Service ID 2252

Passenger Info

Member Info Log In