Train 1H02 London Charing Cross to Hastings

Operated By Southeastern

d. 1638

a. 1640

d. 1641

p. 1643

a. 1645

d. 1647

p. 1649

p. 1651

p. 1652

p. 1653

p. 1655

p. 1657

p. 1659

p. 1700

a. 1702

d. 1703

a. 1712

d. 1713

a. 1720

d. 1722

p. 1723

a. 1727

d. 1728

Wells Tunnel Jn.

1min Performance Allowance

p. 1729

a. 1732

d. 1734

p. 1736

a. 1740

d. 1741

p. 1743

p. 1750

p. 1752

a. 1756

d. 1757

p. 1805

a. 1807

d. 1808

a. 1811

Schedule Info

Departing Sat 27/04/2024
Created Tue 30/01/24 20:41
Validity 16/12/23 until 01/06/2024
Schedule ID W00248 (8612879)
Schedule Type WTT
Duration 01 hrs 33 mins

Train Info

Operated By Southeastern
Timed For 100mph
Power Type EMU
Service Type Express Passenger (XX)
Service Code 24602004
Flow Info London - Hastings Via Tonbridge
Service ID 2202

Passenger Info

Member Info Log In